Project : Thorold Cogeneration Plant

Northland Power — Thorold, Ontario

CHA Canada assisted with technical development aspects of this 250 MW combined cycle gas turbine (CCGT) cogeneration project (GE 7FA), and upon the project’s award by the OPA, we continued to provide related on-site and off-site engineering services throughout design, construction, commissioning and testing.

Project Services:
  • Owner's engineer