UMass Memorial Medical Center CCHP Project Case Study by Aaron Bolhous

Download this presentation

CHA Canada and CHA teamed with Cogen Power Technologies and Bette and Cring Construction to provide a 2.65 MW natural gas fired engine generator that will provide hot water, steam and chilled water to supplement the power, heating and cooling loads to the UMass Memorial Medical Center located in Worcester, MA. The plant is designed to import and export power, and under most conditions, provide all of the hospital’s electric needs.