Load Management Systems – Critical Equipment for Successful CHP Projects by Saqib Khattak

Download this presentation

This presentation focuses on Load Management Systems (LMS), which provide several key supervisory and control functions for a CHP project. The following control are available through the human-machine interface (HMI):

  • Import/export control
  • Emergency load shedding
  • Under frequency load shedding
  • Manually initiated automatic synchronization
  • Automatic bus transfer
  • Distribution system monitoring
  • Tap changer and protective relay control
  • Spinning reserve calculations
  • Topology management
  • Communications
  • General display functionality
  • Alarm logging

By incorporating the LMS functions listed above, one can meet the challenging interconnection and operational requirements of today’s CHP projects.